I had the brilliant idea to go into our Mkto Admin and change the progression status of our content channel from "Engaged" to "Downloaded".
Great.
The problem is now all our existing marketo programs under this channel are not synching the leads who "Downloaded" into the respective SFDC campaign because "Downloaded" does not exist. Instead, it shows these leads at the first progression status which is "Sent". I can't alter the progression statuses in SFDC because "Engaged" is already utilized by many members of the campaign.
So back to Mkto Admin I go, to change "Downloaded" right back to "Engaged". The question now is HOW do I force Marketo to resynch with the SFDC campaign so those leads can have their progression statuses fixed?
I know i could do a campaign where I take these folks OUT and then back IN to the program, but I don't want to fudge up our beautiful dates and such.
Is there another alternative?