I had a campaign defined where a second invitation email was originally scheduled to be sent this morning at 12:01. Because there were last minute changes that needed to be made to the email, I changed the "Wait" date/time to today at 5pm. The second email went out as originally scheduled at 12:01.
Can I change a flow step once the campaign is activated? Can I change the "Wait" date/time and the specific email to send?