Yes Mike,
I had an entire thing for you, but it looks like the system erased it.
Your routing flow should listen for a Data Value Change, then check if the lead is a Member of Engagement X or Y, then Add them to the new Engagement, while removing them from the other one.
There are three exit methods:
- Change Status = Not in Program (lose data)
- Pause
- Move to an empty Stream (pauses, keeps data).
So keep that in mind.