The ability to create ideas and blogs are temporarily disabled. We apologize for the inconvenience.

Allow the cloning of individual assets across workspaces (and make it easier to clone the assets to/from a central repository)

Allow the cloning of individual assets across workspaces (and make it easier to clone the assets to/from a central repository)

Our environment consists of 23 country workspaces and lead partitions.  One of those workspaces is a "Center of Excellence" (CoE) workspace that contain program templates that can be cloned and then customized by that country marketer (with all of the pre-built smart campaigns in place).  We also want to offer up a library of reusable assets - specifically emails and landing pages - that the global marketers can use in their local campaign activities.  As you know, you cannot create a standalone asset outside of a program (in Marketing Activities).  Even if we create a single program to store all of these assets, Marketo still does not allow you to clone individual assets (within a program) to other programs in different workspaces.  When there's a desire to re-use an asset from another program in another workspace, you must take the following steps:

  1. Clone the ENTIRE program into an existing folder in the targeted workspace (often times, you'll receive errors since there will be a reference within a smart campaign that isn't shared/available in the targeted workspace - so this will require yet another step to first clone the program within the same workspace and delete all smart campaigns, so that you're left with a bare-bones program with just the asset(s) in the program)
  2. Clone the desired asset(s) into the other program in that workspace
  3. Delete the cloned program. 

That's a lot of overhead when needing just one asset.  It would make our lives so much easier if we could simply clone individual assets from one program/workspace to another.

So then we thought, let's just create these in Design Studio.  The problem here is you cannot clone an asset in DS into a program (in Marketing Activities) that exists in a different workspace.

Today, this is a much more complex/tedious process:

  1. Clone the asset from the program to a temporary folder in Design Studio of whichever workspace the program is in
  2. Once in DS, clone the asset to a temporary "move-me" folder in the same workspace
  3. Drag the "move-me" folder to the desired workspace in DS
  4. Move the asset out of the "move-me" folder and into the "** REUSABLE EMAILS **" folder
  5. Delete the "move-me" folder in DS

And then when someone wants to use the asset in their program, they must first:

  1. Clone the asset to a temporary "move-me" folder in the same workspace
  2. Drag the "move-me" folder to the desired workspace in DS
  3. Clone the asset in the "move-me" folder to the desired program in Marketing Activities
  4. Delete the "move-me" folder in DS

Ideally, here's how we would like the entire workflow to work (a 2-step process vs. 9 steps):

  • Clone the reusable asset from a program to a pre-defined folder in Design Studio (e.g., "** REUSABLE EMAILS **" within the CoE workspace) - regardless of what workspace this program resides in Marketing Activities
  • When someone wants to use this asset in their program, they simply clone the asset from Design Studio into their program in Marketing Activities - regardless of what workspace this program resides in Marketing Activities
1 Comment
kh-lschutte
Level 1
Status changed to: Open Ideas